NEUHÄUSER overhead monorail

 - Rail systems (EHB - Rail systems)


Over the last few years, mining has reached a high technical standard in many different areas. High-performance mining is now gradually making its way into many different areas of the sector, and this is reflected in the higher face component loads and increasing material transports.

Overhead monorail material transport systems have to be adapted to these new challenges.

 

NEUHÄUSER has been developing the standard profile I140E+N (DIN 20593) for overhead monorails in underground mine areas for over 50 years now. Even today, this profile forms the basis of the I140E+N standard rail system produced and sold by NEUHÄUSER.

To meet the increasing requirements of high-performance mining, and at the request of the mining sector, NEUHÄUSER has developed an additional overhead monorail system: the I140V+N high-performance rail system. This rail system has been successfully used in many mines since 1995 and it fulfils all the necessary requirements for an efficient and safe transport of materials with high-performance diesel trolleys.

 

I140E+N rail system

A series of rails put together
and mainly suspended with chains
to create a section form the path
for an overhead monorail.


 

more >>

I140V+N rail system

This profile is particularly suitable for use in overhead monorail systems
with high carrying trolley loads,
a high usage frequency, on steep inclines
or for quick transport.


 

more >>